1 live · 0 funding
SOLAR NOW
0.00 MW
STORED TODAY
0.00 MWh
CURTAILED TODAY
0.00 MWh
DEMAND SERVED
0.00 MW
PRICE INDEX
100 modelled
06:30
Day 9 · idle
No roof? Everyone can now invest in solar.
Renters and apartment owners have a key, but no roof. Energy X opens solar to all of them — and turns wasted sun into stored energy.
INCLUSION
Invest from €1, no roof needed
EFFICIENCY
Less wasted solar energy
CLIMATE
Less CO₂ from evening oil
Cyprus throws away almost half of its distributed solar.
3.3%
2022
13.4%
2023
29%
2024
47%
2025
65%
Jan–May 2026
Share of distribution-connected renewable energy curtailed · 2025: 306 GWh ≈ 51,000 homes for a year
CyprusGrid via pv magazine (2022–2025, Jan–May 2026) · homes: Cyprus Mail
Curtailment right now
one 3.6 MW solar park · grid takes at most 1.44 MW · simulated
Solar output · MW
0.00 MW
fed into the grid
curtailed above the grid limit
grid limit 1.44 MW
last 24 h
Curtailed · last 24 h
7.46 MWh
Lost market value · last 24 h
€1,364
Extra CO₂ permits · last 24 h
€365
Extra CO₂ emitted · last 24 h
4.8 t
Lost value at the €183/MWh average evening price · CO₂ at ~€49 and 0.65 t per wasted MWh (2025 estimate, pv magazine)
PUBLIC
Solar-side battery · Next to PV plant 1
ERC-1155 · EX-01-B
Category B · 5 MWh · Next to PV plant 1 · 1 token = €1 · project page, visible to everyone
100%
€1,000,000 of €1,000,000 · 23 holders
Funded · ERC-1155 tokens minted · asset live
BANK OF CYPRUS API · LAST RESPONSESIMULATED
LIVE PURCHASES · CITIZENS, COMPANIES, INSTITUTIONS · EACH ON CHAIN
ADMIN
Energy X · new project
pick a site
BATTERY POOL
1 battery · 4.5 MWh · 2.5 MW
Indicated500 kWh
EAT supply0 kWh
PV linkedplant 1 only
ModeIDLE
◀ discharge0.00 MWcharge ▶
TODAY · MWh
Stored
0.00
Curtailed
0.00
Unmet
0.00
Streetlights
0.25
EnergyPass
0.67
To grid
0.00
Ε
Ελένη · renter, apt 4B · reserved energy left
140 of 150 kWh · 250 tokens
JINIUS API · LAST RESPONSESIMULATED
EnergyPass reserved · 401 customers · 90.0 MWh a month
LAST 24 H
Solar output · MW
0.00 MW
to grid
battery charging
curtailed
┄ grid limit
Energy distribution from storage · MW
0.00 MW
streetlights
EnergyPass packs
grid export
unmet (hatched)
Pool state of charge
10%
Energy price index · modelled, not market data
100
After sunset, stored solar powers homes.
Homes and businesses reserve energy packages on Jinius and pay the current market price only for what they use. Ελένη’s reservation goes down only by what she consumes; whatever is left is exported to the grid market.
What the battery earned · live
3.6 container-days so far · costs pro rata from the central plan
Energy delivered (EnergyPass, streetlights, grid)14.37 MWh
Revenue at the modelled market price€2,039
Operation & maintenance−€238
Insurance−€40
End-of-life recycling reserve−€131
PV park owner (10%)−€204
Energy X management fee−€40
Energy X revenue share (investors above 5% IRR)−€163
To investors€1,223
Ελένη’s share · 250 tokens€0.30
Simulated sunny days fill the battery every day, faster than the yearly plan of 300 full cycles. Price index is modelled, not market data.
Per container per year · central plan
Research-based estimate · 250 + 50 full cycles a year · 20-year life
Energy sold (MWh)1,094
Average market price€183/MWh
Revenue€200k
Midday solar bought for extra cycles−€20k
O&M, insurance, end-of-life reserve−€41k
PV park owner (10%)−€20k
Energy X fees (0.4% + 8% share)−€20k
To investors€98k
Investor IRR7.6%
Energy X takes its 8% revenue share only above a 5% investor IRR.
Proof on chain
Anchor#132
2ee4d017644a0400d262f445e3e5e683
Anchor#131
32a4b1e6ca0cdfec1745455c26fdf376
Anchor#130
c9af31546be6bba01a3fd40b4f68741b
Anchor#129
ffc52e46208e048f93a7729ed573d2c7
Anchor#128
50ca107dcb2fda19d05346ac5e9ff5ba
Stored energy conservedOK
Ελένη’s entitlement reconcilesOK
Hash chain intactOK
Bank of Cyprus · SIMULATED
Jinius · SIMULATED
Nokia IOC · SIMULATED
EVM (Anvil) · LIVE SANDBOX
BONUS · Smart City Nicosia: streetlights on only where needed.
Energy X supplies the streetlights from storage and switches them dynamically — saving power and CO₂.
Lights on now
0%
Streetlight load now
0 kW
Saved today vs always-on
468 kWh
City saves per year · this district
239 MWh
Cost saved per year · at €183/MWh
€43,769
CO₂ avoided per year · 0.65 t/MWh
155 t
Nicosia sensor · traffic_count 12 · observed 12:04 UTC SIMULATED
Modelled district of 120 kW streetlights · presence profile modelled · real data via Nicosia IOC once access is confirmed · yearly figure = today × 365
BONUS · Blackout? Batteries restore supply in seconds.
The grid operator can call on Energy X batteries when a line or plant fails — more resilience for Cyprus when energy supply routes are at risk.
GRID NORMAL
pool at 10% · ready to support
How the money flows · per container per year
central case · research-based estimate
INVESTORS
SolarShares
€1 tokens on Jinius · next: Energy X Fund across many batteries
€1M
€98k
5 MWh battery
stores wasted solar · sells 1,094 MWh
€200k revenue
energy
€183/MWh
BUYERS
EnergyPass
homes, businesses, the city · market price for what they use · rest exported to the grid
306 GWh
solar curtailed in Cyprus in 2025
CyprusGrid via pv magazine
+20.9%
a year · containerised battery market
MarketsandMarkets, 2025–2030
7.6%
investor IRR per container
central estimate
€20k
a year for Energy X per container, + one-off arrangement fee
revenue share only above 5% investor IRR
Roadmap
1
Hackathon demo · real sandboxes, local chain
2
Found the company
3
Licences · storage, EnergyPass, tokens
4
First container next to a solar park
5
More projects · Category C
6
Energy X Fund · secondary token market
7
World domination (joke)
No dates yet · licences: Category B then C storage, EnergyPass supply or partner licence, licensed partner for tokens and their secondary market
Energy X is the key to Cyprus’s energy problems.
CURTAILMENT
Surplus stored, not wasted
HIGH PRICES
Solar energy after sunset
CO₂
Less fossil generation at night
I still don’t own a roof. But now I own a piece of a battery.